Per Village Ordinance and State Statutes , no owner or contractor may construct, erect, alter, enlarge, repair, move, convert to other uses, or demolish any building, structure or mechanical system until a valid permit is obtained from a Municipal Building Inspector. The building permit shall be issued if the requirements for filing and fees are satisfied, and the plans have been conditionally approved.
At the time of building permit issuance, the applicant shall pay fees as established by resolution periodically by the Village.
If work commences prior to approval, the permit fee shall be double, the work must stop, and you may be fined for each day of non-compliance.
A properly completed application form must be submitted and accompanied by the designated fee. Applications for a Building Permit shall be made to the Village Building Inspector for the following:
Applications shall be made directly to the Village Board for the following:
**Applications made directly to the Village Board MUST be submitted to the Village Office no later than the Tuesday prior to the next monthly Board meeting for approval. If work commences prior to approval, the permit fee shall be double, the work must stop, and you may be fined for each day of non-compliance.
Forms will be provided by the Village or the Building Inspector and shall include the following:
A building permit is NOT required for:
The Village contracts with General Engineering Company for building inspection services.
Josh Copsey
Residential & Commercial Building Inspector
916 Silver Lake Drive | PO Box 340 | Portage, WI 53901
Work Cell - 608-697-2905
Main Office -608-742-2169
jcopsey@generalengineering.net
Village Clerk/Treasurer
Shawna Atterbury
453 Canal Street
PO Box 156
Bloomington, WI 53804
Hours
Monday through Thursday
7:30 am to 4:00 pm
(working remotely on Thursdays and available by email only)
Contact
Office: 608.994.3851
The following forms are for construction activities that require a permit from the Village Building Inspector and must be submitted with the designated fee to Josh Copsey at the address above.
The following forms are for construction activities that require a permit directly from the Village Board and must be submitted with the designated fee to the Village Clerk at the address above no later than the Tuesday prior to the next monthly Board meeting for approval.